Quote:
|
Originally Posted by uhohNumber2brb
All I really need is to have the foundation poured, and the basic structure/frame of the house up, and the plumbing. I have a contracting friend who remodels houses and will have do everything else...
How difficult was it to get the above done?
|
That work itself isn't too hard. Like beanie is saying though the permits and inspection is a pain in the ass, but should be done by the persons erecting the frame work and pouring the slab. You might need to be roughing in for electrical too, if the electrical company runs things underground in your area.